Reinforcing steel pipe - List of Manufacturers, Suppliers, Companies and Products | IPROS

Reinforcing steel pipe Product List

1~3 item / All 3 items

Displayed results

AGF-Me (Metal eco) construction method

It is possible to separately collect steel pipes and injection materials during tunnel excavation! A construction method that allows for resource utilization as sorted industrial waste.

The "AGF-Me (Metal eco) method" is a patented method (Patent No. 3882118) for the non-widening long steel pipe advance construction. It features vertical slits in the end-reinforcing steel pipes of the cutting section during tunnel excavation with non-widening support, allowing for the separate recovery of the steel pipes and injected materials during excavation. This method eliminates unnecessary mixed industrial waste and enables resource utilization as sorted industrial waste. [Features] - Patent No. 3882118 obtained - Structure allows for the separate recovery of steel pipes and injected materials during excavation - Eliminates unnecessary mixed industrial waste and enables resource utilization as sorted industrial waste *For more details, please refer to the PDF document or feel free to contact us.

  • Work tools
  • Special Construction Method
  • Reinforcing steel pipe

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work | Achieving shortened construction periods with immediate start and zero leftover soil using the RES-P method.

Immediate construction with zero spoil and zero curing! The RES-P method for ground reinforcement reduces excavation costs and shortens the process through the use of small-diameter steel pipe penetration without the need for cement.

To prevent the risk of ground subsidence in new residential construction, it is important to carry out ground reinforcement work based on accurate surveys. Ignoring insufficient ground bearing capacity can lead to uneven subsidence, causing distortion and structural defects in buildings, which can significantly diminish the asset value of the home in the future. The RES-P method is a rational piled raft foundation technique that involves driving small-diameter steel pipes into the ground, enhancing ground bearing capacity through the composite effect of the steel pipes and soil. This method does not use any cement-based solidifying agents, which means that no construction waste is generated on-site, completely eliminating disposal costs and transportation expenses. Additionally, since there is no need for a solidification curing period, work can transition to foundation construction immediately after pouring, greatly contributing to the reduction of tight project schedules. The use of small machinery based on a 2-ton truck allows for smooth construction with low noise and vibration, even in narrow or adjacent sites. GeoTech Co., Ltd. provides overwhelming construction efficiency and reliable reinforcement quality through objective evidence of penetration data and strict quality control using construction management devices.

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Reinforcing steel pipe

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work | RES-P method for tackling narrow sites and densely populated residential areas with low noise.

Overcoming narrow plots and densely populated residential areas! The RES-P method for ground reinforcement considers neighbors with low-noise, low-vibration construction using 2-ton compact heavy machinery and non-excavation penetration.

In residential construction, appropriate ground reinforcement work is crucial to prevent ground subsidence and maintain structural stability. This is particularly challenging in densely populated urban areas or narrow sites, where difficulties in bringing in large construction machinery, noise and vibration for nearby residents, and issues with the scattering of construction debris pose significant problems. The RES-P method, which utilizes piled raft foundation technology, addresses these conditions. This method employs lightweight and compact small machinery based on a 2-ton vehicle, allowing for easy access and construction even in sites with narrow front roads or access routes. Since it uses a non-disposal rotary penetration method without cement-based solidifying agents, the noise and vibration during work are extremely minimal, and there is no scattering of muddy water or dust. While maintaining a clean site environment considerate of nearby residents, it dramatically enhances the bearing capacity under the foundation through the combined effect of the ground and thin steel pipes (with an outer diameter of 48.6 mm). GeoTech Co., Ltd. provides safe and smooth on-site construction with a robust system and high-precision quality tracking using construction management devices.

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Reinforcing steel pipe

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration